在线播放亚洲第一字幕,日韩一线无码AV毛片免费,国产一区二区三区在线观看免费,国精品无码一区二区三区左线

產品詳情
  • 產品名稱:韓國三星磨料

  • 產品型號:PV-10/PCL-15
  • 產品廠商:其它品牌
  • 產品文檔:
你添加了1件商品 查看購物車
簡單介紹:
韓國三星振動耐磨測試磨料/韓國三星指定專用磨料 重量:14.5KG/袋 黃色型號:PV-10 綠色型號:PCL-15 作用:三星產品噴涂電鍍等測試,如:按鍵、塑膠外殼、涂料表面耐磨擦測試。
詳情介紹:
韓國三星指定磨料

產品名稱:
振動耐磨測試磨料
 
詳細介紹:
 First of all, thank you for buying one of our machines.
 
   We are producing Vibratory Finishing Machines, Vibration applied machines, Precision processing special machines with our accumulated technology and thorough quality systems under our motto that we serve our customers with the best quality products
.
  We would like to introduce, through this manual, how to properly use the machine, to perform its best function in operation that our development and production team have made with their endeavors.
 
  This manual will guide the users to understand the equipment, how to use in the best conditions, how to increase productivity, how to maintain the equipment in the very simple way.
For anything that is not sufficiently described, please feel free to contact our office, then we will supply with further information that we can do.
 
   We hope this equipment will do a good role in your business, Good luck!
 
                      From all the members of Jin Poong B.R. Tech.
 
 
WARRANTY
 
1.Warraty period of this equipment is 1 year or 2000 hours whichever comes first. and warranty period of the electrical parts is 6 months.
 
韓國三星磨料  韓國三星磨料  韓國三星磨料  韓國三星磨料  韓國三星磨料
  This is based on the normal operation, operators mistake or mishandling of the equipment, excessive operation beyond its capability and failure to maintain on time will release the warranty obligation.
 
2. In any case that the user has changed the machine parts or corrected without any prior agreement, this warranty will be invalid..
 
  PAINTING DURABILITY TESTER MACHINE
              MODEL  :  TC - 15 (SM - 1502)
 
I.  COMPOSITION OF THE EQUIPMENT
1. VIBRATORY TUMBLER
2. SOUND COVER
3. AUTO WATER & COMPOUND SUPPLY SYSTEM
4. CONTROL UNIT
   
II.  SPECIFICATION OF THE EQUIPMENT
   1. VIBRATORY TUMBLER
   Tub interior dimension:  W180mm x L530mm
    In-put area dimension:  W130mm x L530mm
   LINING : Hot pour Polyurethane Casting, Thickness: 15mm
   Motor  : 220V x 1Hp x 3ph x 60Hz. (2 pole)
   Motor R.P.M : 3500
 2. SOUND COVER
   L920mm x W620mm x H900mm+120mm
   Top door with Gas Cylinder
 
3. AUTO WATER & COMPOUND SUPPLY SYSTEM
   Water tank, metered to be 500ml
   Water tank, metered to be 1000ml + addition of Compound 200ml
   Water tank, metered to be 500ml + addition of Compound 20ml
   Compound metering pump 300ml/min, adjusted to supply 200 ml by a timer.
   Compound metering pump 20ml/min, adjusted to supply 20 ml by a timer.
 
III. UTILITY REQUIREMENT
    1 Electrical Power:  220V x 1Ph (20A). 
    2 Tap water:  4L/Hr. (To be linked to the  right side of the  control unit by  8mm hose.)
 
IV. INSTALLATION
 
             Just place on the flat concrete floor without any anchoring.
In case the equipment is not horizontally leveled, the mass in the tumbler can move to a side,
please be careful.
 
             Please link 3 wires from the motor to the U.V.W. terminal in the control box.
             Please link 2 wires from the main source of electrical power to the R.T. terminal in the box.
       
             Please link tap water to the supply valve on the right side of the control box by 8mm hose.
             In case Tap water contains some foreign substance, please install pre-filter before this hose.
             Please link a hose(20mm) from the hose nipple on left side of the control box to the main machine.
             A little longer hose is shipped with machine, please cut it off and adjust depending on
the site allocation
       
.            Please link the discharge valve on the rear side of machine to the laboratory discharge pipe line.
             Please leave the discharge valve always open except for the maintenance.
             A compound container needs to be placed in the room under the control box.
             Please remove the top lid and place the container in the room and put a separate lid pre-drilled
on 3 places, 1 big hole in the center and 2 small holes on the right and left.
             On the center hole, please place a level sensor which emit alarm when there is not enough
compound in the container,
and on the right and left holes insert 2 hoses that come from the metering pumps.
       
 
V. OPERATION
 
   Supply the control box with power (put the Breaker switch ON, put the disconnect switch ON) and
put the selector switch ON, then you will have light on the Power lamp.
 Fill the vibratory tumbler with media 15L (11.25L of Cone and 3.75L of Pyramid).
 
Put the Mode to Manu and push on Start.
If the mass turns from front to back, the motor direction is correct.
In case it turns in the opposite direction please correct by changing the wire.
 
1.     PREPARATION COURSE
The media contains some flashes and burrs. This course is, prior to the main course of testing, 
to condition the media by tumbling to the right purpose of the testing.
 
                  First of all, put MODE to Manu and push on PRE WATER-1, then 500ml tank will be filled with water.
                  Pls push on only once, if you push on twice it will be stopped.
O                 Once it is full, it will be automatically disconnected. When the water is evacuated, the tank
 is automatically refilled, therefore from next time, there is no need to put to Manu and fill again.
.
             Set the timer 4 hours or 10 hours as required by your company (currently designated to be 10 hours).
             Put Mode to PRE and push on Start then the tumbler will start to run and 2000 ml of water
will be supplied automatically.(4 times of 500ml)
                  At the time of start, 2000ml will be supplied and 500ml will be supplied every 30 min. automatically.
 
  The tank always keeps water 500ml. and supplies when it is required.
 
2. MAIN COURSE OF TESTING
   
This course is to test whether the testing parts are safe or damaged when the media and parts
have rubbed each other in the vibratory tumbler.
       
First of all, put MODE to Manu and push on MAIN Water-1, then water will be ready with 1000ml
in the tank 1, push on MAIN Water-2 then water will be ready with 500ml in the tank 2.
                  Push on Comp-1, then 200ml of compound will be added to 1000ml of water  in the tank-1.
             Push on Comp-2, then 20ml of compound will be added to 500ml of water in the tank-2.
 
              Pls push on only once, if you push on twice it will be stopped.
              Once you have filled for the first time, when the liquid is evacuated, it is made again automatically
therefore there is no need to do manually again.
             Set the timer 1 hour or 2 hours as required by your company.
             Put the MODE to Manu and start the machine, then 1000mml of water and 200ml of compound
will be automatically supplied in the beginning and 500ml of water and 20ml of compound
will be supplied every 30 min.
        
 (Note) When there is not enough compound, you will have Alarm light on the control panel,
please fill the container with compound.
 
       VI. MAINTENANCE
 
             In case the inverter inside the control box repeats to trip, one of the 3 wires from the motor
might have been disconnected by the vibration. Please take out the vibratory tumbler from the
sound proof box and disassemble the drain pipe lines and lift up the tub and check the wires
from the motor. If any of the wires were disconnected, please correct it.
 
In case there is any loud noise from the vibratory tumbler, the bearings on the motor must have
broken, please replace them referring to the assembly drawing of the motor.
 
In case the liquid of water and compound is not supplied well, some foreign substance might have
been stuck in the ball, please clean the valve referring to the separate manual.
 
 In case compound is not well injected from the metering pump, please clean the balls on the
suction and discharge port of the diaphragm pump.
(Referring to the separate manual, pls clean part No. 2,3,4.)
This may happen after long holidays.
 
Please clean the filter that is installed right after the in-put water valve on the right side of
the control box.
 
VII. WARRANTY & FREE REPLACEMENT
   We warrant quality for either 380 days from the date of shipment or 2000 hours of operation,
whichever comes first. In case any part does not work properly, we send replacement part only.
韓國磨料
韓國磨料
.                 
標題:
內容:
聯(lián)系人:
聯(lián)系電話:
Email:
公司名稱:
聯(lián)系地址:
 
 
注:1.可以使用快捷鍵Alt+S或Ctrl+Enter發(fā)送信息!
2.如有必要,請您留下您的詳細聯(lián)系方式!
點擊這里給我發(fā)消息

粵公網安備 44031102000146號

丰满老熟好大BBB| 国产精品一区久久久久久| 少妇老师寂寞高潮免费a片| 久久精品夜色国产亚洲AV| 少妇特殊按摩高潮惨叫无码| 亚洲成A人片在线观看无码专区 | 强睡邻居人妻中文字幕| 久久久久久AV无码免费网站| 丰满乳亲伦小说| 国精产品一区一区三区糖心| 按摩师舌头进去添的我好舒服| 亚洲熟妇丰满多毛XXXX| 大肉大捧一进一出| 精品国产粉嫩内射白浆内射双马尾| 久久久久久AV无码免费看大片| 国产av网站| 久久久久久人妻一区二区三区| 插插网| 欧美三级在线播放| 亚洲色欲综合一区二区三区 | 警察被两个混混脱裤玩j视频| 女同互慰高潮呻吟免费播放| 久久精品国产亚洲AV忘忧草18| 国产精品久久久久精品综合紧| 看片神器免费| 日韩中文字幕区一区有砖一区| 联系附近成熟妇女| 国语自产偷拍精品视频偷| 亚洲日韩乱码中文无码蜜桃臀| 曰批国产精品视频免费观看| 免费男人下部进女人下部视频| 清明节的来历和风俗| 亚洲AV综合色区无码另类小说| 解开警花的裙子猛烈进入| 羞答答的玫瑰静悄悄的开歌词| 久久久中日AB精品综合| 精品日本一区二区三区在线观看| 国产在线国偷精品免费看| 亚洲日韩欧美一区二区三区| 一女多男3根一起进去描述| 国产不卡一区二区|